Enviro EF3 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Pelletofen Enviro EF3 herunter. Enviro EF3 User's Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 43
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE
SHERWOOD INDUSTRIES IS AN ENVIRONMENTALLY RESPONSIBLE COMPANY. THIS MANUAL IS PRINTED ON RECYCLED
PAPER.
EF-118
PELLET STOVE
EF3
OWNER’S MANUAL
Freestanding, Fireplace Insert,
and Built-In Heater
PLEASE READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE
OF THIS PELLET BURNING ROOM HEATER. FAILURE TO FOLLOW THESE
INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE, BODILY INJURY,
OR EVEN DEATH.
Contact your building or fire officials about restrictions and
installation inspection requirements in your area.
Seitenansicht 0
1 2 3 4 5 6 ... 42 43

Inhaltsverzeichnis

Seite 1 - OWNER’S MANUAL

PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCESHERWOOD INDUSTRIES IS AN ENVIRONMENTALLY RESPONSIBLE COMPANY. THIS MANUAL IS PRINTED ON RECYCLED P

Seite 2 - Table of Contents

10Routine Cleaning and MaintenanceNOTE: Do not use abrasive cleaners to clean the surface or any part of the stove.The following should be inspected p

Seite 3 - Introduction

11ASH PAN (2-3 days)Monitor the ash level every week. Remember that different pellet fuels will have different ash contents. Ash content is a good in

Seite 4

12Installation of firebox backing:• Install the side panels in place. Insert center panel, hold the panels in place• Install the top rod by sliding i

Seite 5

13InstallationDECIDING WHERE TO LOCATE YOUR PELLET APPLIANCE:1. Check clearances to combustibles.2. Do not obtain combustion air from an at

Seite 6 - Operating Instructions

InstallationDIMENSIONS - FREESTANDING:       

Seite 7

15InstallationCLEARANCES TO COMBUSTIBLES - FREESTANDING:When installing this unit on a combustible floor (for example linoleum, hardwood f

Seite 8

16InstallationCLEARANCES TO COMBUSTIBLES - BUILT-IN HEATER:Refer to Figures 12 and 13.Side wall to unit - 8 inches (20.3 cm)Mantel projection -

Seite 9

17become hot enough to cause burns if touched by children. Non-combustible shielding or guards may be required.3. Termination must exhaust above the

Seite 10 - 16” Wrench or Socket

Outside fresh air is mandatory when installing this unit in airtight homes and mobile homes. When connecting to an outside fresh air source, do not us

Seite 11 - Heat exchange

19Figure 22: Corner Installation. InstallationMOBILE HOME INSTALLATION - FREESTANDING:2" (5 cm)2"(5 cm)6"(15 cm)Floor ProtectionFresh A

Seite 12

Table of Contents2Introduction...

Seite 13 - Installation

InstallationHORIZONTAL EXHAUST THROUGH WALL INSTALLATION - FREESTANDING:Vent installation: install vent at clearances specified by the vent manufactur

Seite 14

21Installation10. The pipe must extend at least 12” (30 cm) away from the building. If necessary, bring another length of pipe (PL type) to the outsid

Seite 15 - Side Wall

InstallationINSIDE VERTICAL INSTALLATIONS - FREESTANDING:1. Choose a stove location that is ideal. See the section “DECIDING WHERE TO LOCATE YOUR PE

Seite 16

23InstallationNon-combustiblefloor protection.Existing floor(combustible)6"(15 cm)Rain capFlashing24"(61 cm)2"(5 cm)Tee withcleanoutFre

Seite 17

Installation                

Seite 18

25              

Seite 19

Non-combustiblefloor protection.Existing floor(combustible)6"(15 cm)3" (7.5 cm)PedestalWallthimbleFresh airintakeRodentmesh cap45°elbow12&qu

Seite 20

27InstallationINSTALLATION AND REMOVAL OF THE SURROUND PANELS - FPI AND BIH:Magnetic StripsTwo (2) pieces makeup one (1) corner bracketCorner Brackets

Seite 21

REMOVAL:When maintenance is required on the unit the surround must be removed. Follow steps 3 through 6 in reverse order. The side pane

Seite 22

29TroubleshootingThis troubleshooting is for both Timer Control and Circuit Board style EF3. It will be stated if the troubleshooting relates only to

Seite 23 - Clearance

3IntroductionPELLET QUALITY:Pellet quality is important, please read the following:Your enviro pellet stove has been designed to burn wood pellets onl

Seite 24 - EDESTAL INSTALLATION”)

Troubleshooting Caution: Installation of a new start-up timer without checking the ignitor resistance may cause another failure to the new start-u

Seite 25

31Troubleshooting● Check all the connections between the controller, switch, and the convection blower against the wiring diagram.● If the convectio

Seite 26

● To test the exhaust vacuum, place a magnehelic gauge in the sensor end of the vacuum tube. It should read 0.5” W.C. If the reading is good, r

Seite 27

Troubleshooting3310. The stove will not shut off.General:● If the unit will not shut off, ensure that the thermostat (if equipped) is turned down bel

Seite 28

34If the stove goes out and there are no pellets in the liner, the auger is stopping.General:● See “The auger motor will not function normally” and “

Seite 29 - Troubleshooting

Wiring DiagramCIRCUIT BOARD:BrownBrownGreyGreyRedYellowBluePurpleOrangeOrangeWhite BlackJ25 AmpFusesThermostat5 V DCWhiteBlackHotCommonPowerCordGround

Seite 30

Wiring DiagramTIMER CONTROL:YellowYellowPurplePurpleOrangePowerCordBrownBrownRedIgnitor120oF (49oC)IgnitorTemperatureSensor160oF (71oC)ConvectionTempe

Seite 31

Parts ListReference NumberDescription Part Number1 Exhaust Temperature Sensor 120°F (60°C) [Circuit Board] EC-0011 Exhaust Temperature Sensor 140°F (6

Seite 32

Reference NumberDescription Part NumberFirebox Liner Top Plate EF-066Dial-a-Fire Knob [Timer Control] EF-067” ID Auger Collar with Set Screw EF-069Kn

Seite 33

39Parts ListReference NumberDescription Part NumberCircuit Board Decal [Circuit Board] 50-17944 Control Panel Touch Latch 50-32345 Combustion Blower E

Seite 34

4IntroductionIMPORTANT SAFETY DATA:Please read this entire Owner’s Manual before installing or operating your ENVIRO Pellet Stove. Failure to follo

Seite 35 - Wiring Diagram

Parts Diagram - ComponentsEF3 - Components (115V)December 200440

Seite 36

41Parts Diagram - SteelEF3 - Steel Components (220V)December 2004

Seite 37 - Parts List

42WarrantySherwood Industries Ltd. gives a five year limited warranty on all steel manufactured parts. A one-year warranty is provided on all electri

Seite 38

43The following information must be recorded by the installer for warranty purposes and future reference.NAME OF OWNER:_______________________________

Seite 39

5IntroductionASHES: Disposed ashes should be placed in a metal container with a tight fitting lid. The closed container of ashes should be on a non-co

Seite 40 - Parts Diagram - Components

6Operating InstructionsAUTOMATIC SAFETY FEATURES:Your pellet Stove has the following safety features:A. The stove will shut off when the fire

Seite 41 - Parts Diagram - Steel

Auger TrimAuger Trim Auger Trim2 Seconds"ON"3 Seconds"ON"Factory Setting4 Seconds"ON"1 1 145  

Seite 42 - Warranty

8Operating InstructionsOPERATING YOUR PELLET STOVE - CIRCUIT BOARD:PRE-BURN INSTRUCTIONS: The burn pot liner holes must be clear and the liner install

Seite 43 - Installation Data Sheet

9Operating InstructionsOPERATING YOUR PELLET STOVE - TIMER CONTROL:Figure 4: Dial-A-Fire control panel. 1. Check and fill hopper with pellets.2. Mak

Kommentare zu diesen Handbüchern

Keine Kommentare